London, Leisure, New Gym Facility
What We Did
Select MEP were appointed to produce the Stage 5 contractor design for a new gym facility with changing rooms and shower block, as well as 2 floors of open plan gym space.
Our duties included:
- Stage 5 design and co-ordinated drawings
- Heat loss and gain calculations
- HVAC and public health design
- Detailed equipment schedules
- Electrical Co-ordination