London, Leisure, New Gym Facility

What We Did 

Select MEP were appointed to produce the Stage 5 contractor design for a new gym facility with changing rooms and shower block, as well as 2 floors of open plan gym space. 
 
Our duties included:
 
  • Stage 5 design and co-ordinated drawings
  • Heat loss and gain calculations
  • HVAC and public health design
  • Detailed equipment schedules
  • Electrical Co-ordination